Edmonton ERF energy output at different waste throughputs

Case id
2026-293

Request

Date received

Following your response to EIR 2026-290, I would like to request the following information under the Environmental Information Regulations 2004. 

Please provide any engineering calculations, performance specifications, design documents or other information showing the expected heat and electricity output of the new Edmonton Energy Recovery Facility at different levels of waste throughput. 

I am particularly interested in the outputs at annual waste volumes of approximately 700,000, 600,000, 500,000, 400,000 and 300,000 tonnes, or whatever operating levels have been assessed. 

Please include information held by NLWA or by contractors on its behalf, including the expected heat available for export to Energetik. 

I am not requesting new calculations, only existing information. If no such information is held, please confirm this. 

Response

Response date

Good afternoon, 

Further to our acknowledgement of your environmental information request with reference (2026-293), our response is as follows. 

Your request: 

Following your response to EIR 2026-290, I would like to request the following information under the Environmental Information Regulations 2004. 

Please provide any engineering calculations, performance specifications, design documents or other information showing the expected heat and electricity output of the new Edmonton Energy Recovery Facility at different levels of waste throughput. 

I am particularly interested in the outputs at annual waste volumes of approximately 700,000, 600,000, 500,000, 400,000 and 300,000 tonnes, or whatever operating levels have been assessed. 

Please include information held by NLWA or by contractors on its behalf, including the expected heat available for export to Energetik. 

I am not requesting new calculations, only existing information. If no such information is held, please confirm this. 

Our response 

NLWA has previously provided the CHP Development Strategy, https://northlondonheatandpower.london/media/r04i55j2/ad05-06_chp_development_strategy_lores.pdf. which is the information held showing the expected heat and electricity performance of the ERF. The document contains design assumptions and expected electricity and heat outputs.  

However, NLWA does not hold information showing expected heat and electricity outputs at specific annual throughput levels of 700,000, 600,000, 500,000, 400,000 or 300,000 tonnes per annum. Consequently, no information is held that directly correlates those throughput levels with heat and electricity outputs. 

If you are dissatisfied with the handling of your request, you may ask for an internal review, which should be submitted within two months of when you received our response to either informationrequests@nlwa.gov.uk or enquiry form quoting the above reference. 

If you are not content with the outcome of the review, you may complain to the Information Commissioner, Wycliffe House, Water Lane, Wilmslow, Cheshire, SK9 5AF, or via their online portal. The Information Commissioner will not usually accept complaints before a review has been completed.  
 Website: https://ico.org.uk  

  

Kind Regards, 

North London Waste Authority